Keysight Technologies X-Series Manual page 14

Signal analyzer
Hide thumbs Also See for X-Series:
Table of Contents

Advertisement

Upgrade Instructions
8. Torque all sixteen screws that were installed in steps 4 through 7 to 9 in-lbs.
Front Panel Installation
9. Referring to
Figure
and attach W2 (1) to the A1A3 Front Panel Daughter board.
Figure 9
W2 Connection
10.Referring to
Figure
the seven flathead screws (1) on each side and the two flathead screws (2) on the bottom of
the instrument. Torque all sixteen screws to 21 in-lbs.
14
9, position the A1 Front Panel assembly near the front of the instrument
10, attach the A1 Front Panel assembly to the instrument and secure it with
Installation Note N9042-90013

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9042b

Table of Contents