Graco PM8 Repair Instructions page 8

Hide thumbs Also See for PM8:
Table of Contents

Advertisement

Repair
5. Disassemble the bezel (1) from the meter housing
(10) (F
. 3).
IG
NOTE: Take care not to damage solenoid wire (14a).
10
F
. 3
IG
6. Disconnect the solenoid wires (14a) from the
terminal block on the bezel (1) (F
1
14a
F
. 4
IG
8
7. Recycle and dispose of the replaced bezel
8. Remove and discard gasket (2) that is located
Reassembly
1
1. Replace the gasket (2) with the new one from the
14a
2
2. Reconnect the solenoid wires (14a) to the terminal
Optional - replace batteries (36) with four (4) new
alkaline batteries.
Optional - Replace the original foam pieces (39).
3. Route the solenoid and the battery wires as shown
. 4).
IG
Terminal
Block
according to local recycling regulations.
between the meter housing (10) and bezel (1), see
F
. 3.
IG
kit, adhesive side down, onto the meter housing
(10), see F
. 3, discarding the unused second
IG
gasket (2).
block on the bezel (1). The wires are polarity
independent so place one wire in each terminal
opening, see F
. 4.
IG
in F
. 5.
IG
3A8560C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pm20

Table of Contents