Graco PM8 Repair Instructions page 25

Hide thumbs Also See for PM8:
Table of Contents

Advertisement

5. Reconnect the solenoid wires (14a) to the terminal
block on the bezel (1). The wires are polarity
independent so place one wire in each terminal
opening, see F
. 55 on page 23.
IG
Optional - replace batteries (36) with four (4) new
alkaline batteries.
6. Replace the foam piece (39) on the meter housing
(10) (F
. 60).
IG
27
F
. 60
IG
7. Route the solenoid and the battery wires as shown
in F
. 5 on page 9.
IG
8. Position the bezel (1) so the display is in the upright
position when holding the valve.
9. Reassemble the bezel (1) to the meter housing (10),
see F
. 54 on page 23.
IG
10. Replace the four screws (9) and torque to 15 to 25
in-lbs (1.69 to 2.82 N•m), see F
11. Reinstall the extension (3) to the meter housing (10).
12. Reassemble the impact guard (37), see F
page 23.
13. Replace the meter onto the hose.
3A8560C
39
14
10
10
. 53 on page 23.
IG
. 52 on
IG
Repair
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pm20

Table of Contents