20 Commissioning

In this chapter

20.1 Overview: Commissioning

20.2 Precautions when commissioning

FXHA-A
VRV system air conditioner
4P673749-1A – 2022.11
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during commissioning
and hand-over to the user.
20.1
Overview: Commissioning ......................................................................................................................................................
20.2
Precautions when commissioning..........................................................................................................................................
20.3
Checklist before commissioning.............................................................................................................................................
20.4
To perform a test run .............................................................................................................................................................
This chapter describes what you have to do and know to commission the system
after it is installed.
Typical workflow
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing a test run for the system.
INFORMATION
During the first running period of the unit, the required power may be higher than
stated on the nameplate of the unit. This phenomenon is caused by the compressor,
that needs a continuous run time of 50 hours before reaching smooth operation and
stable power consumption.
NOTICE
Before starting up the system, the unit MUST be energised for at least 6  hours to
avoid compressor breakdown during startup.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure sensors/switches. If NOT,
burning of the compressor might be the result.
NOTICE
ALWAYS complete the refrigerant piping of the unit before operating. If NOT, the
compressor will break.
20
Commissioning
|
Installer and user reference guide
75
75
75
76
76

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv fxha50aveb8Vrv fxha63aveb8Vrv fxha100aveb8

Table of Contents