Download Print this page

NEC N8143-93 Setup Manual page 22

Rack conversion kit

Advertisement

Step 2: Install the server in 19-inch rack
1.
The figure shows the positions on which the rails and core nuts are installed. Install the core
nuts at the points identified by the figure.
Core nut mount position
4U
Slide rail mount position
2.
Loosen the four fixing screws on the bracket for rear side to allow you to adjust the length of
guide rail (both rail assemblies).
Cable arm mount position
FRONT
Outer rail
Slide rail mount position
Bracket for rear side
Sliding rail
7
Core nut mount position
BACK
Fixing screws

Advertisement

loading