•
Digital voltage regulation: ±0.5% RMS no-load to full-load
•
Automatic start with programmed cranking cycle
•
Programmable exerciser can be set to start automatically on any future day and time, and run every week or every two
weeks
•
Exercise modes
o
Unloaded cycle exercise with complete system diagnostics
o
Unloaded full-speed exercise
o
Loaded full-speed exercise (Model RXT ATS required)
•
Front-access mini USB connector for Kohler
•
Integral Ethernet connector for Kohler
•
Built-in battery charger
•
Remote two-wire start/stop capability for connection of Model RDT or other transfer switches
•
Diagnostic messages
o
Displays diagnostic messages for the engine, generator, Model RXT transfer switch, programmable interface
module (PIM), and load management device
o
Over 70 diagnostic messages can be displayed
•
Maintenance reminders
•
System settings
o
System voltage, frequency, and phase
o
Voltage adjustment
o
Measurement system, English or metric
•
ATS status (Model RXT ATS required)
o
Source availability
o
ATS position (normal/utility or emergency/generator)
o
Source voltage and frequency
•
ATS control (Model RXT ATS required)
o
Source voltage and frequency settings
o
Engine start time delay
o
Transfer time delays
o
Voltage calibration
o
Fixed pickup and dropout settings
•
Programmable Interface Module (PIM) status displays
o
Input status (active/inactive)
o
Output status (active/inactive)
•
Load control menus
o
Load status
o
Test function
TP-7092
11/22
SiteTech™ connection
®
®
®
OnCue
Plus Generator Management System
19