Figure 3-31 Lower Shroud Installation - Emerson Daniel 3812 Maintenance And Troubleshooting Manual

Liquid ultrasonic flow meter
Hide thumbs Also See for Daniel 3812:
Table of Contents

Advertisement

Maintenance and Troubleshooting Manual
3-9000-767 Rev A
19.

Figure 3-31 Lower Shroud installation

A.
B.
C.
D.
A. Upper Shroud
B. Hex head nut with tooth lock washer
C. Shroud clamp and tab
D. Lower Shroud
20.
21.
22.
23.
24.
25.
Transducer housing Installation
Slide the lower Shroud beneath the meter body. Make sure the transducer cables are
moved out of the way and will not be pinched when the Shroud is reinstalled.
Lift the lower Shroud until the bolts align with the upper Shroud tab and notches and
the lower Shroud is flush with the top inside lip of the upper Shroud.
Install the four Shroud clamps onto the lower Shroud bolts and secure with the four hex
head nuts and external tooth lock washers. Tighten the nuts with a 7/16 inch (12mm)
wrench.
Apply power to the meter and connect to Daniel MeterLink. Open the detailed view in
Meter Monitor and verity the meter is acquiring data, the transducers have good signals
and flow profiles for the chords are displayed.
Use the
Tools>Transducer Swap-out
Wizard. The Transducer Swap-Out Wizard is a utility that allows you to easily update
parameters such as path lengths, delay times, and delta times for chord. This is
necessary anytime transducers and transducer housing s have to be replaced for a
chord. The wizard guides you through updating which chords have been changed,
which components in the chords have been changed, as well as recalculating new path
lengths based on the information entered. This utility is only available while connected
to a meter.
Disconnect communications with the meter and close Daniel MeterLink.
This completes the installation of the transducer housing, transducer capsule, and
transducer cables.
Section 3: Meter maintenance
menu path to access the Transducer Swap-out
June 2011
63