Powering On The Sparcstorage Library; Figure 4-7 Scsi Connectors On The Tape Library Rear Panel - Sun Microsystems SPARCstorage Library Installation Manual

Hide thumbs Also See for SPARCstorage Library:
Table of Contents

Advertisement

4

4.3 Powering On the SPARCstorage Library

4-8
5. Install the SCSI jumper block in the middle two SCSI connectors on the
tape library.
See Figure 4-7
6. Install the SCSI terminator in the right SCSI port on the back panel of the
tape library.
See Figure 4-7
Power switch
SCSI cable
SCSI jumper block
Figure 4-7
SCSI Connectors on the Tape Library Rear Panel
This section describes how to power on the SPARCstorage Library. The power
switch and connector for the power cord are located on the back of the
SPARCstorage Library, as shown in Figure 4-7.
To power on the SPARCstorage Library:
1. Make sure that the power switch on the back of the SPARCstorage Library
is in the off (0) position.
2. Close and lock the door.
SPARCstorage Library Installation Manual—February 1995
SCSI terminator

Advertisement

Table of Contents
loading

Table of Contents