Introduction
6.3
Reference
1
2
3
4
5
6
7
8
9
10
11
12
13
OPA1622EVM Schematic
1
OPA1622EVM Measured Performance Summary
2
OPA1622EVM Bill of Materials
1
Introduction
The OPA1622 is a high-performance, bipolar-input SoundPlus™ audio operational amplifier. For a full list
of electrical characteristics of the OPA1622, please refer to the OPA1622 product datasheet (SBOS727).
2
Performance Specification Summary
A summary of the OPA1622EVM performance specifications is provided in
given for a supply voltage of V
Specification
Total Harmonic Distortion Plus Noise
(THD+N) at 1 kHz
THD+N vs. at 1 kHz
Second Harmonic - Left Channel
Second Harmonic - Right Channel
Second Harmonic - Left Channel
Second Harmonic - Right Channel
2
..........................................................................................................
List of Figures
..................................................................................................
.................................................................................................
..................................................................................
...................................................................................
...................................................................................
...................................................................................
...................................................................................
..................................................................................
...................................................................................
.................................................................................
....................................................................................................
................................................................................................
.................................................................................................
List of Tables
...........................................................................................
= ±5 V and at an ambient temperature of 25°C, unless otherwise noted.
s
Table 1. OPA1622EVM Measured Performance Summary
V
= 1 Vrms, Load = 32 Ω, Measurement Bandwidth
IN
V
= 1 Vrms, Load = 16 Ω, Measurement Bandwidth
IN
V
= 1 Vrms, Load = 32 Ω, Fin = 1 kHz
IN
V
= 1 Vrms, Load = 32 Ω, Fin = 1 kHz
IN
V
= 1 Vrms, Load = 16 Ω, Fin = 1 kHz
IN
V
= 1 Vrms, Load = 16 Ω, Fin = 1 kHz
IN
Copyright © 2016, Texas Instruments Incorporated
......................................................................
Table
Test Conditions
= 90 kHz
= 90 kHz
www.ti.com
13
10
11
12
13
1. Specifications are
Measured Performance
-108.10 dB
-107.8 dB
-125.45 dBV
-126.90 dBV
-120.25 dBV
-120.68 dBV
SBOU172 - September 2016
Submit Documentation Feedback
3
5
6
6
7
7
8
8
9
9
2
Need help?
Do you have a question about the SoundPlus OPA1622EVM and is the answer not in the manual?