3

Modifications

This EVM is designed to provide access to the features of and measure the performance of the OPA1622.
Modifications of the OPA1622EVM can be made and include; adjusting the gain, phase shift, and cut-off
frequency. The schematic of the OPA1622EVM is displayed in
OPA1622EVM, see
Left Channel Input
(Right Channel Input)
3.1

Gain

Equation 1
and
Equation 2
V
Left ChannelOutput
V
Right ChannelOutput
Most applications require the left and right channel to be balanced. Balancing the outputs is accomplished
by setting R2 = R4 = R6 = R8 and R1 = R3 = R5 = R7. This simplifies
Equation
3.
V
Left ChannelOutput
If the channels require unbalanced gain, the gain of each channel can be calculated using
Equation
5.
Gain
Left Channel
given
R
= R
2
Gain
Right Channel
given
R
= R
6
SBOU172 – September 2016
Submit Documentation Feedback
Figure
13.
R1 (R5)
IN>
R3 (R7)
IN+
R4
(R8)
Figure 1. OPA1622EVM Schematic
display the transfer function of the circuit shown in
æ
ö
R
R
4
2
=
´
+
ç
÷
1
+
R
R
R
è
ø
3
4
1
æ
R
R
=
8
´
+
6
ç
1
+
R
R
R
è
7
8
5
V
=
=
Right ChannelOutput
R
2
=
R
1
and R
= R
4
1
3
R
6
=
R
5
and R
= R
8
5
7
OPA1622EVM SoundPlus™ Audio Operational Amplifier Evaluation Module
Copyright © 2016, Texas Instruments Incorporated
Figure
C1 (C3)
R2 (R6)
OPA1622
C2
(C4)
Copyright © 2016, Texas Instruments Incorporated
æ
ö
R
2
´
+ -
´
-
ç
÷
(IN )
(IN )
R
è
ø
1
ö
æ
ö
R
´
+ -
6
´
-
÷
(IN )
(IN )
ç
÷
è
R5
ø
ø
R
2
(
)
(IN )
(IN )
´
+ -
-
R
1
Modifications
1. For a full schematic of the
Left Channel Output
(Right Channel Output)
Figure
1.
Equation 1
and
Equation 2
Equation 4
(1)
(2)
into
(3)
and
(4)
(5)
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SoundPlus OPA1622EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents