10
Installation on board a ship
Fig If the dryer is intended for installation on
board a ship, fittings are mounted from factory
1
(instead of feet) on the dryer for attachment to
the ship floor by means of 4 M8 bolts.
Drilling plan, see fig. 1.
Installation on board a ship
1
12,5
573
Front
M8
12,5