Initial Operation Check - CardioQuip MCH-1000 Operators & Service Manual

Cardiopulmonary bypass temperature controller
Hide thumbs Also See for MCH-1000:
Table of Contents

Advertisement

Initial Operation Check

Prior to operation in a clinical setting for the first time, or after extended storage, the following
procedures should be performed. Contact CardioQuip if any failures are encountered.
WARNING: It is the operator's responsibility to use, check, and maintain this
device according to the labels of the product, accompanying instruction
manuals, and any revisions of the labeling or instructions that may be
subsequently issued.
WARNING: Proper surgical procedures and techniques are the responsibility of
the operator.
WARNING: To avoid the risk of electrical shock, this equipment must only be
connected to a supply mains with protective earth.
WARNING: Use a dedicated 20 Ampere AC "hospital grade" grounded outlet.
WARNING: This device must not be connected to a heat exchanger or blanket
with a manufacturer recommended max. pressure rating of less than 83 kPa
(<12 psi). Rupture or leakage may occur in the heat exchanger resulting in patient
injury and/or damage to the system.
WARNING: During clinical operations, do not drain equipment connected to the
MCH. Draining attached equipment will drain the entire heat exchanger network.
WARNING: Do not operate the MCH with blocked water flow. Hoses must be
attached, and any valves must be open, so that water can flow freely. Operating the
MCH without hoses, or with closed valves on the hoses, will damage the pump and
void the warranty.
WARNING: If water in the water tank appears discolored, emits a foul smell, or
shows visual signs of biofilm, the device must be immediately removed from
use. Contact CardioQuip Customer Service for details regarding servicing
assistance.
WARNING: If the external tubing appears cloudy or discolored, immediately
remove the device from service and contact CardioQuip Customer Service for
details regarding servicing assistance.
CAUTION: Position the MCH to allow easy access to the mains power plug. The
operator must be able to quickly unplug the device from mains power if necessary.
CAUTION: Do not completely drain the system while in an operating mode. Dry
operation will cause equipment damage. Use the tank drain to remove water from
the tank for adding additional ice, if necessary.
40
MCH OPERATION | Initial Operation Check

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for CardioQuip MCH-1000

This manual is also suitable for:

Mch-1000iMch-1000m

Table of Contents