Mch Operation; Unpacking; Physical Inspection - CardioQuip MCH-1000 Operators & Service Manual

Cardiopulmonary bypass temperature controller
Hide thumbs Also See for MCH-1000:
Table of Contents

Advertisement

MCH OPERATION

Unpacking

Carefully inspect the shipping carton for damage. If damage has occurred, contact the carrier
and request a damage report prior to opening the carton. Notation of damages with the
delivery person will speed the filing of damage claims.
CAUTION: Do not lift the MCH by the drain or water connections. Lifting by these
connectors will cause equipment damage.
To open the carton, carefully cut the strapping material at the bottom of the carton. Lift and
remove the upper portion of the carton. Lift the unit (per the Lifting instructions) from the
base of the carton and place directly on the floor. Check the carton to be sure that no loose
parts or documents are inside. Store the carton for later shipment of the MCH.

Physical Inspection

1. Check power cord for cuts, exposed wire, bent or missing pins.
2. Inspect external cabinet and controls for dents or other physical damage.
3. Check that all warning labels are properly affixed.
4. Inspect external water connectors for leaks or physical damage. Look for water
accumulation on or under the unit, as this may indicate an internal leak.
5. Clean and inspect the water strainers located in the water tank with a nylon brush.
6. Have qualified service personnel remove side panels and perform steps 7-9.
WARNING: Electric shock hazard. Access panels should be removed only by
qualified service personnel.
7. Inspect the inside of the cabinet for water leaks, loose water connections, and visible
damage.
8. Inspect the internal wiring for exposed wires, loose connections, and visible damage.
9. Replace the side panels.
39

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for CardioQuip MCH-1000

This manual is also suitable for:

Mch-1000iMch-1000m

Table of Contents