Scba Donning Procedure - MSA G1 Operating Manual

Hide thumbs Also See for G1:
Table of Contents

Advertisement

6.2

SCBA Donning Procedure

(1)
Slide the right arm through the right shoulder strap.
(2)
Slide the left arm through the left shoulder strap.
a) Check correct orientation of shoulder straps.
(3)
Bend forward slightly; resting the carrier on the back.
(4)
Fasten the waist belt and pull forward on the waist strap
pull tabs to tighten for a snug fit.
a) Most of the SCBA weight should be carried on the
hips.
G1 Integrated SCBA System
Donning
GB
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents