PROFITEST H+E EASY CHECK
Duty cycle
When testing with 20 A has been completed, the TEST FINISHED message
appears.
5. Press OK.
The test results are displayed (PASSED or FAILED).
The TEST 32A CABLE? prompt appears at the display
17
The pulse-to-pause ratio of the PWM signal is checked. Avail-
able charging current is indicated in this way.
Gossen Metrawatt GmbH
Need help?
Do you have a question about the PROFITEST H+E EASY CHECK and is the answer not in the manual?