LG ESS Home 8 Installation Manual page 73

Energy storage system
Hide thumbs Also See for ESS Home 8:
Table of Contents

Advertisement

SE Box Wiring: Power
No.
Home 8 Terminals
a
Grid Terminal (L1,L2)
Ground Terminal (Grid, Load) - 6
b
Positions
c
Backup Load Terminal (L1,L2)
d
Neutral Terminals (Grid, Load)
Neutral Terminals
e
(Home 8, PV Inverter)
Ground Terminal (Home 8, PV
f
Inverter) – 6 positions
g
Non-Backup Load Terminals (L1,L2)
h
N-GND Bonding Busbar
i
RESET Button
j
USB Connector
k
DRM Connector
l
Ethernet Connector
* Use copper or aluminum conductors rated at 90 °C (194 °F).
Due to our policy of continuous product innovation, some specifications may change without notice.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Recommended Wire Color
Black, Red
Green, Bare
Black, Red
White
White
Green, Bare
Black, Red
Included with the SE Box
-
-
-
-
Installation
Wire Gauge
6 AWG – 300 kcmil
14 AWG – 2/0 AWG
6 AWG – 250 kcmil
6 AWG – 250 kcmil
14 AWG – 2/0 AWG
14 AWG – 2/0 AWG
6 AWG – 250 kcmil
2
45 mm
-
-
(Optional)
24 AWG CAT5 or better
73