LG ESS Home 8 Installation Manual page 43

Energy storage system
Hide thumbs Also See for ESS Home 8:
Table of Contents

Advertisement

SE Box Main Breaker Installation
If the system is installed as service equipment, a main breaker must be installed.
LGEUS does not provide the main breaker.
Remove the L1 and L2 lugs on the supply side using a 10 mm hex socket wrench.
a
Install a compatible main breaker by fastening the 2 nuts.
b
WARNING
Before mounting a main breaker in an electrical system, make sure there is no voltage present
where work is to be performed. The voltage in energized equipment may cause injury or death.
INFO
y Main breaker terminal insulators are recommended any time a main breaker is installed in
the SE Box.
y Eaton® CSR or BW type breakers can be used. Refer to "Compatible Eaton Parts" for
breaker types and required accessories.
Due to our policy of continuous product innovation, some specifications may change without notice.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
10 mm hex
75 kgf·cm (65 lbf·in)
torques
L2
L1
Installation
L1
L2
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Home 8Smart energy boxRba008k0a00Ra768k16a11Rea200ap0

Table of Contents