Installation
Internal Panelboard and Additional Fastener
SE Box has an internal panelboard, where Eaton BR circuit breakers and BRS225 / BRPSF225 (sub-
feed lug block) can be installed. The internal panelboard provides 5 spaces for 2-pole breakers as
shown in the following diagram (
Use hold down kit (Eaton BRHDK125), when an additional fastener is required for the circuit breaker
to comply with NEC and the local code. This hold down kit can be used in placement of
d
e
Use
~
placements stainless steel screws with, when the sub-feed lug block may be needed to
install multiple Home 8 units and PV inverters. It is recommended that the terminal of the lug block
should head to the right in consideration of wire bending space.
Do not connect the load to the internal panelboard to insure the stable operation of the whole
system.
The ampacity sum of the circuit breakers should not exceed 200Amps. If a 200A circuit breaker is
used at the main breaker load center connected to the lug block, no additional circuit breakers should
be installed on the internal panelboard.
Following the NEC and local codes is first priority.
44
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
a
e
~
a
b
d
Due to our policy of continuous product innovation, some specifications may change without notice.
).
a
~
c
only.
c
e

Advertisement

Table of Contents
loading

This manual is also suitable for:

Home 8Smart energy boxRba008k0a00Ra768k16a11Rea200ap0

Table of Contents