LG ESS Home 8 Installation Manual page 56

Energy storage system
Hide thumbs Also See for ESS Home 8:
Table of Contents

Advertisement

Installation
Any circuit connected to the SE Box will not be powered when disconnected from the grid. During
on-grid operation, these circuits are still metered by the internal site net metering with no additional
metering hardware required.
However, if non-backup load panels exist upstream of the SE Box, additional CTs are required. In this
case, refer to "Usage of External CTs".
Terminals
Grid lug (L1, L2)
Non-Backup Load
Lugs (L1, L2)
Backup Load Lugs
(L1,L2)
Large Neutral
Lugs
Medium Neutral
Lugs
Earth Lugs
INFO
y Refer to "SE Box Wiring: Power" for all wiring requirements and recommendations, including
wire colors and gauges.
y Refer to "Whole Home Backup (Service Equipment)" for example system wiring diagrams.
56
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Wire Gauge
6 AWG ~ 300kcmil
6 AWG – 250 kcmil
6 AWG – 250 kcmil
6 AWG – 250 kcmil
14 AWG – 2/0 AWG
14 AWG – 2/0 AWG
Due to our policy of continuous product innovation, some specifications may change without notice.
Tool Size
32 mm (1.25
1/4 inch Hex
inches)
32 mm (1.25
5/6 inch Hex
inches)
32 mm (1.25
5/6 inch Hex
inches)
32 mm (1.25
5/6 inch Hex
inches)
Flat head
20 mm (3/4
Screwdriver
inches)
(6 mm)
Flat head
20 mm (3/4
Screwdriver
inches)
(6 mm)
Strip
Torque
Length
288 kgf-cm
(250 lbf·in)
259 kgf·cm
(225 lbf·in)
317 kgf·cm
(275 lbf·in)
2 – 2/0 AWG –
58 kgf·cm
(50 lbf·in)
6 – 4 AWG –
52 kgf·cm
(45 lbf·in)
14-8 AWG –
40 kgf·cm
(35 lbf·in)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Home 8Smart energy boxRba008k0a00Ra768k16a11Rea200ap0

Table of Contents