Using the supplied CT Harness, connect it to the upper side of the CT. When wiring, refer to
c
the figure below for the direction of the Ring Terminal.
S1 : Black (PV L1+), S2 : White (PV L1-)
Ring terminal: stud size - 1/4 inch, wire range - 18AWG
By using the sealable covers included in the CT packaging box, protect screw terminals to
always assure the best safety. Refer to the manual included in the CT package to assemble
the sealable covers.
After connecting the end of the CT Harness to pins 1 and 2 of the terminal block for PV
D
CT in the SE Box, respectively, S1 (PV L1+) and S2 (PV L1-), plug it into the connector and
tighten the screws on both sides of the terminal block.
Fix the cable in the hook as shown in the figure below.
Due to our policy of continuous product innovation, some specifications may change without notice.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Installation
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Home 8Smart energy boxRba008k0a00Ra768k16a11Rea200ap0

Table of Contents