(3) 131H to 136 Demand detection setting
The following operation method is setting.
Demand current, action of demand active power, high-alarm value, time interval, power factor, demand active
power.
131H
Demand current upper
limit
RESET/
SHIFT
136
Power factor
operation method
◆ 131H Demand current upper limit. 133H Demand active power upper limit.
Set the high-alarm value of demand current(DA) and demand active power(DW).
The setting range is 5 to 100% (1% step). Selection by + and - , set value is updated by SET .
Default setting:80% (Demand current) , OFF [Non use] (Demand active power)
◆ 132 Demand current time interval. 134 Demand active power time interval.
Set the time interval (95% time interval) of demand current(DA) and
demand active power(DW). Selection by + and - , set value is updated
by SET .
Default setting:0 second (Demand current, Demand active power)
0sec
5sec
<None>
4min
5min
30min
◆ 135 Demand active power operation method
The operating system of demand (DW) can be selected from d
(operating system according with bimetallic type:demand)
and A (Averaging arithmetic in demand time delay:average).
Selection by + and - , set value is updated by SET .
Default setting:d (Operating system according with
● Demand time delay characteristic (Demand current, Demand active power)
100
95
80
Demand
60
value
(%)
40
20
0
0
Arithmetic method
Demand current measurement
Demand active power measurement:Arithmetic method according with bimetallic type (Default value).
100% indication time is about 3 times the time delay at the case of the arithmetic method according with
bimetallic type.(In case of 10 minutes/95% of time interval, time to reach to 100% is about 30 minutes.)
Demand measurement is measured to the 2 times of the rated current, and the 2 times of a rated active power.
RESET/
Demand current time
SHIFT
RESET/
SHIFT
10sec
20sec
3min
2min
6min
7min
25min
20min
bimetallic type)
Time delay 10 minutes
10
20
Time(min)
:Arithmetic method according with bimetallic type.
Or the averaging arithmetic in a demand time interval.
One is selected by setting.
132
RESET/
SHIFT
interval
135
RESET/
Demand power
SHIFT
operation method
30sec
40sec
1min
50sec
8min
9min
15min
10min
d:Operating system
according with
bimetallic type
30
42
SQLC-220-086
133H
Demand power upper
limit
RESET/
SHIFT
134
Demand power time
interval
New setting
Current setting
Setting factor
Setting No.
Demand current time interval
A:Averaging
arithmetic in
demand time
delay
Arithmetic method according
with bimetallic type.
(Indication time to 95%
of a final constant value)
Averaging arithmetic in
demand time delay.
(Averaging time in demand
time delay.)