5.4. Connection Of Heating Systen and Water Installation
Heating system must be drawn with suitable diameter pipe for providing enough
circulation of heating water. Choosing Radiator pipes smaller than it is needed, fitting
constriction or blockage can inability circulation of heating. Connections that are
made to device must be easy removable when it is needed. There must be separate
cut off valve at device radiator inlet and outlet. Also there must be silt trap at inlet part
between valve and device. Valve and still trap must be used at boiler cold water inlet.
5.5. Filling Of Heating Installation
Filling process is done with blue colour filling tap under the device. This process must
be done by implementing following instructions
 Be sure that cold inlet tap of boiler is open.
 Open the filling tap.
 When water pressure indicator reaches between 1-1,5 bar, close the filling tap.