STEP 5
Lastly, unscrew four (4) Screws and detach the I/O Bracket (using
I/O BRACKET
Phillips head screwdriver).
EK provides the replacement I/O Bracket with the water block.
STEP 5
PREPARING THE WATER BLOCK FOR INSTALLATION
STEP 1
M3 x 10 AX1 SCREW
First, remove the terminal badge which is attached to the terminal with
two magnets. Under the badge, unscrew three (3) screws M4 x 20
DIN7984. Additional five (5) screws M3 x 10 AX1 need to be removed
(as shown in the image). Save the removed parts for later use.
DO NOT REMOVE THE UPPER TERMINAL BADGE!
For this step, you will need:
Phillips Head Screwdriver
Allen Key 2.5mm
UPPER TERMINAL BADGE
M4 x 20 DIN7984 SCREW
TERMINAL
STEP 1
BADGE
- 10 -
Need help?
Do you have a question about the Vector2 Strix/TUF RTX 4090 D-RGB ABP Set and is the answer not in the manual?
Questions and answers