STEP 3
M2.5-M3 x 6.6
STANDOFF
STEP 4
Screws must be present in the places marked on the picture.
STEP 4
After securing the GPU PCB, position the five (5) M2.5-M3 x 6.6
standoffs. Tighten it with the provided tool (EK-Plug out Spludger
Tool).
For this step, you will need:
EK-Plug Out Spludger Tool
- 16 -
Need help?
Do you have a question about the Vector2 Strix/TUF RTX 4090 D-RGB ABP Set and is the answer not in the manual?