Toyota 7FG 10 Repair Manual page 79

Table of Contents

Advertisement

R e m o v a l P r o c e d u r e
R e m o v a l P r o c e d u r e
1 1
Remo
Re
movethe
vethe sh
2 2
Re
Remo
movethe
vethe sh
3 3
Remo
Re
movethe
vethe sh
4 4
Rem
Remove
ove the
5 5
Remo
Re
move
ve th the cl
6 6
Discon
Dis
connec
nect t the
7 7
Re
Remo
movethe
vethe sh
I I n s t a l l a t
n s t a l l a ti o n
i o n P r o c e d u r e
The installat
The installation proced
ion procedure is
   
shif ift t le leve
ver r kn
knob
ob. .
shif ift t le leve
ver r co
cove
ver. r.
shif ift t le leve
ver. r.
the ser
servic
vice e cov
cover,
er, and
and loo
loosen
e clam
amp o
p on n th the l
e low
ower er si side
the cab
cable le fro
from th
m the e tra
transm
shif ift t le leve
ver r ca
cabl ble. e.
P r o c e d u r e
ure is the reverse
the reverse of the removal proc
G E N E R A L
G E N E R A L
S S PECI FI
PECI FICATIONS
CATIONS
https://www.besttruckmanuals.com/
3
3
2 2
sen the
the cab
cable le loc
lock n
k nut.
ut.
de of of th the e ve
vehi hicl cle. e.
nsmiss
ission s
ion side
ide. .
of the removal procedure
edure. .
DIFFERENTIAL
DIFFERENTIAL
   
   
3-1
3-1
Page
Page
3-2
3-2
3-5
3-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents