Appendix 1.2Operation Processing Time - Mitsubishi MELSEC QS Series Programming Manual

Hide thumbs Also See for MELSEC QS Series:
Table of Contents

Advertisement

(2) Basic instructions
The processing time when the instruction is not executed is calculated as follows:
0.10
LD =
AND =
OR =
LD < >
AND < >
OR < >
LD >
AND >
OR >
LD < =
App-6
Appendix 1 OPERATION PROCESSING TIME
Appendix 1.2 Operation Processing Time
(Number of steps of each instruction +1) µs
Instruction
When executed
When executed
When executed
When executed
When executed
When executed
Conditions (Device)
When continuity established
When no continuity
When not executed
When continuity established
When no continuity
When not executed
When continuity established
When no continuity
When continuity established
When no continuity
When not executed
When continuity established
When no continuity
When not executed
When continuity established
When no continuity
When continuity established
When no continuity
When not executed
When continuity established
When no continuity
When not executed
When continuity established
When no continuity
When continuity established
When no continuity
Processing Time (µs)
0.40
0.40
0.35
0.40
0.40
0.35
0.40
0.40
0.40
0.40
0.35
0.40
0.40
0.35
0.40
0.40
0.40
0.40
0.35
0.40
0.40
0.35
0.40
0.40
0.40
0.40

Advertisement

Table of Contents
loading

Table of Contents