After Installation; Sealing - Takara Belmont MAJOLICA PORTO EX-SB 1 Series Installation Instructions Manual

Table of Contents

Advertisement

After installation

Caution
Be sure to execute the inspection without fail to prevent accidents during operation
Inspection
1. Check that there are no missing screws or other parts.
2. Check that there are no loose parts
3. Check that there are no cracks or contamination on the basin.
4. Check that there are no problems, such as flaws on the external appearance.
5. Check that there are no water leakage on the floor.
6. Check that there are no big gaps between basin and wall.
7. Put drops of water on the shower head holder and neck base to check that there are no water leaks.
    
8. Check that the neck cushion does not touch the basin and can be inserted smoothly,
when putting the neck fittings on the neck base.
13

Sealing

Seal the gaps between the basin and the wall. (The width of sealing : approximately 5mm)
Caution
Ensure to seal the gap between the basin and the wall completely.
Check that there are no cutaway found in the sealing.
If the sealing is not complete, the wall might become corroded
by penetrating water.
Check that the screw and washer are tightened
Check that the packing is attached.
26

Advertisement

Table of Contents
loading

Table of Contents