V-Rtu2000 Series Hardware And Software Training; Curriculum Schedule Syllabus - Veesta World V-RTU2000 Series Technical Information

Table of Contents

Advertisement

V-RTU2000 Series
Veesta - Remote Terminal Unit
Technical Specification Manual
2.5

V-RTU2000 Series Hardware and Software Training

2.5.1

Curriculum Schedule Syllabus

Training items
Alternation layer part
(I/O boards)
collectivity introduce
Function introduce of
network and
communication for
Alternation layer part
Introduce of every
I/O boards and
network for
Alternation layer part
Assembly and wiring
part
Maintenance
The problem of
notice
Workshop
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
The training is disported into two stages one stage is include the
principle of Substation before install the system which last 1~3 days.
The other stage is in the laboratory after installation and debugging
of the products which last 1~2 days for workshop.
During the whole training, every day has 8 periods.
Times
Training contents
Day
System block diagrams
1
System configuration
Function of adopted devices
Day
Function introduce of network
1
and communication for system
introduce of CPU
introduce of inside network
communication with attempter
computer interface and
communication with other IED
Day
Introduce of hardware system
1
use and maintenance of every
I/O boards and terminal unit,
principle and technical index of
every I/O boards and terminal
unit.
Day
Advert problem of locale
2
connection
Day
Introduce of locale/remote
2
maintenance software for
Alternation layer part through use
PC.
Day
Combine maintenance software,
2
introduce of locale coefficient
intercalate, and notice the
problem of system running
Day
In the workshop practice all of
3~4
training program
Table 2-2: V-RTU2000 Series Training Syllabus
Chapter 2 - System Overview
Personnel attended
Run maintenance personnel
System development personnel
Run maintenance personnel
System development personnel
Run maintenance personnel
System development personnel
Run maintenance personnel
Run maintenance personnel
Run maintenance personnel
Run maintenance personnel
System development personnel
Page 24 of 90