Verify the Installation

Item
Check That
The cabinet position is consistent with the equipment room layout
diagram.
All bolts and screws are firmly tightened, especially on electrical
connections. Flat and spring washers are used with each bolt, and
spring washers are placed on the top of flat washers.
The cabinet is clean and complies with dustproof requirements.
All labels are correct, clear, and complete.
Cabinet
The paint on the cabinet exterior is intact. Promptly repaint the
cabinet exterior if necessary to prevent corrosion.
The cabinet door and lock work properly.
The cabinet has no waste tape, cable ties, paper, or packing
materials around it.
All components are properly installed and no component is left
onsite.
Empty cable holes are blocked using plugs or lids.
All cable connections are secure, especially network cable
connections.
Exposed parts of cables and cable lugs near the cable terminals
are wrapped with insulation tape or heat-shrink tubing.
Flat washers and spring washers of all wiring terminals are
securely installed and in good contact.
Cables are bound neatly, and cable ties are secured evenly and
Cable
properly in the same direction.
Excess sections of cable ties are neatly cut.
There is no unnecessary adhesive tape or cable tie on cables.
Routed cables are convenient for future maintenance and
expansion.
Labels at the cable ends are clear.
All ground cables are copper cables with diameters meeting the
requirements. No switch or fuse is allowed on a ground cable, and
no open circuit occurs.
All ground cables, AC input cables, and intra-cabinet cables are
connected correctly according to the power system circuit
diagram, and all screws are fastened. The input and output cables
are not short-circuited.
The smart cooling product input voltage is within the range of
rated voltage ± 10%, and the input frequency is within the range
of rated frequency ± 3 Hz.
Power cables and ground cables are not coiled and excess parts
are cut off.
Electrical
Lugs for power cables and ground cables are welded or crimped
securely.
Power cables and ground cables are routed and bound separately
from other cables.
Lithium batteries are intact, free from damage, cracks, and bulges. □ Passed □ Failed
Lithium batteries are neat and clean, and do not leak electrolyte.
Lithium battery terminals are upright and free from damage,
break, and acid leakage.
The lithium battery cables are correctly connected.
DIP switches on devices are correctly set.
21
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed