Altronix TROVE Trove2KH2 Installation Manual
Altronix TROVE Trove2KH2 Installation Manual

Altronix TROVE Trove2KH2 Installation Manual

Enclosure with altronix/kantech backplane

Advertisement

Quick Links

Access & Power Integration
Trove2KH2
- Trove2 enclosure with Altronix/Kantech backplane (TKH2)
TKH2
- Altronix/Kantech backplane only
Installation Guide
All registered trademarks are property of their respective owners.
Rev. TKH_103017
Installing Company: _________________________ Service Rep. Name: __________________________________________
Address: _________________________________________________________ Phone #: _________________________
SIGNALING
More than just power.™

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TROVE Trove2KH2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Altronix TROVE Trove2KH2

  • Page 1 SIGNALING Access & Power Integration Trove2KH2 - Trove2 enclosure with Altronix/Kantech backplane (TKH2) TKH2 - Altronix/Kantech backplane only Installation Guide More than just power.™ All registered trademarks are property of their respective owners. Rev. TKH_103017 Installing Company: _________________________ Service Rep. Name: __________________________________________...
  • Page 2 Overview: Trove2KH2 accommodates various combinations of Kantech boards with or without Altronix power supplies and accessories for access systems. Specifications: • 16 Gauge grey backplane and enclosure with ample knockouts for convenient access. Trove2KH2 Trove2 enclosure with TKH2 Altronix/Kantech backplane.
  • Page 3 TKH2: Configuration of Altronix Power Supply and/or Sub-Assembly Boards and Kantech Boards 1. Fasten spacers (provided) to pems which match the hole pattern for Altronix Power Supply/Chargers or Altronix Sub-Assembly boards (Fig. 2, pg. 4) . Note: Please fasten metal spacers in the proper locations, see below (Fig. 2, pg. 4) .
  • Page 4 Fig. 2 - Trove2KH2/TKH2 Configurations Altronix Power Supply Metal Spacer Placement Altronix T1618300 Transformer Altronix Sub- Assembly Altronix Sub-Assembly Fig. 2a Fig. 2b Fig. 2c Rubber Concave Washers Metal Plate Step 1a Step 1b Step 1 Step 2 Spacer Bolt...
  • Page 5 Notes: Trove / Kantech Installation Guide - 5 -...
  • Page 6 - UL Listed in the U.S. and Canada. - Local or remote control of up to (2) two Altronix eFlow power output(s) via LAN and/or WAN. - Monitor real time diagnostics: DC output voltage, output current, AC & battery status/service, input trigger state change, output state change and unit temperature.
  • Page 7 TKH2 Dimensions (H x W x D): 25.375” x 19.375” x 0.5” (644.6mm x 492.1mm x 12.7mm) 19.375” (492.1mm) 2.2” (55.9mm) 2.2” (55.9mm) 0.156” ( 3.96mm) 1.0” (25.4mm) 1.0” (25.4mm) 7.5” (190.5mm) 7.5” (190.5mm) 9.2” (233.7mm) 9.2” (233.7mm) Trove / Kantech Installation Guide - 7 -...
  • Page 8 2.00” (50.8mm) 2.00” (50.8mm) 5.25” (133.4mm) 7.00” (177.8mm) 5.25” (133.4mm) Altronix is not responsible for any typographical errors. –––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––– 140 58th Street, Brooklyn, New York 11220 USA | phone: 718-567-8181 | fax: 718-567-9056 web site: www.altronix.com | e-mail: info@altronix.com IITroveKH...

This manual is also suitable for:

Trove tkh2

Table of Contents