Preparing Measurements - TESTO 338 Instruction Manual

Density gauge
Table of Contents

Advertisement

5. Select the printer used: press
6. Press [OK].
Bosch
-
7. Set measurement unit: press
8. Press [OK].
-
Alt
9. Set height above sea level: press
10. Press [OK].
-
The measurement view is opened (duration approx. 5 s).
6.3.

Preparing measurements

Safety
CAUTION
Hot probe shaft may cause burns!
> Wear safety gloves.
> Allow the probe shaft to cool down after a measurement.
Preventing product damage
> Check the fill level of the condensate trap. Empty it if the level is
past the
28.
> Check and clean the gas sampling probe at the very latest after
50 measurements, see Cleaning / replacing the gas sampling
probe, page 34.
> Check the particle filter for signs of contamination. Change the
filter if it is contaminated, see Replacing the particle filter, page
33.
> Check that there is enough filter paper in the instrument
(service lid window). Replace the filter paper when it has been
used up, see Changing the filter paper, page 30.
0545: Testo report printer (IR) 0554 0545
0547: Testo report printer (IrDA) 0554 0547
0549: Testo report printer (IrDA) 0544 0549
FSN
or
flashes.
lights up and the height value flashes.
The height is adjustable in 100 m steps, between -
1500 m (e.g. mining) and 3500 m. In order to achieve
results that are as accurate as possible, the height
must be specified with an accuracy of ± 200 m.
max.
mark, see Emptying the condensate trap, page
[
].
[
].
[
].
6 Using the product
23

Advertisement

Table of Contents
loading