Io Control; Load Management - Fronius Datamanager 2.0 Operating Instructions Manual

Hide thumbs Also See for Datamanager 2.0:
Table of Contents

Advertisement

Mode
DRM4
DRM5
DRM6
DRM7
DRM8
FDI
*
The nominal device output is always meant when referring to the inverter's re-
mote control capability.
IMPORTANT! If no DRM control (DRED) is connected to Datamanager and the
"AUS – Demand Response Mode (DRM)" function is activated, the inverter
switches to standby mode.

IO control

The pins for the IO control can be set here. Additional settings can be adjusted in
the "PSC editor - IO control" menu.
IO control
IO control 1 (optional)
IO control 2 (optional)
IO control 3 (optional)
IO control 4 (optional)
IO control 5 (optional)
Load manage-
Up to four pins for the load management can be selected here. Further settings
ment
for the load management are available in the load management menu item.
Default pin: 1
Description
-P
≤ 100%
nom
+P
≤ 0% without discon-
nom
nection from grid
+P
≤ 50%
nom
+P
≤ 75% & -Q
* ≥ 0%
nom
rel
+P
≤ 100%
nom
on the Fronius DRM inter-
face
The values for Q
can be adjusted in the UC Editor menu item.
rel
De-
fault
pin
2
3
4
5
6
Information
Normal operation without
restriction
Limits the effective power
output
Limits the effective power
output
restricts the effective
power output
and
sets the reactive power
Normal operation without
restriction
IO control
IO control 6 (optional)
IO control 7 (optional)
IO control 8 (optional)
IO control feedback
(optional)
De-
fault
pin
9
6
7
8
9
De-
fault
pin
7
8
9
0
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Datamanager box 2.0

Table of Contents