Visual Inspection And Storage - Pari LC PLUS 022 Instructions For Use Manual

Table of Contents

Advertisement

Drying
• Connect the connection tubing to a compressed air source
(compressor or central medical gas supply system).
• Switch the compressed air source on.
• Leave the compressed air source running until all the mois-
ture in the tubing has been removed.

5.5 Visual inspection and storage

Check all individual components. Replace any broken, de-
formed or seriously discoloured parts.
Storage location:
– dry
– dust-free
– protected from sources of contamination
optional: use sterile packaging
– 38 –

Advertisement

Table of Contents
loading

Table of Contents