2-1
Overview
This chapter provides a quick setup checklist to get your SuperServer 6017R-
M7UF/6017R-M7RF up and running. Following the steps in the order given should
enable you to have the system operational within a minimal amount of time. This
quick setup assumes that your system has come to you with the processor and
memory preinstalled. If your system is not already fully integrated with a mother-
board, processor, system memory etc., please turn to the chapter or section noted
in each step for details on installing specifi c components.
2-2
Unpacking the System
You should inspect the box the server was shipped in and note if it was damaged
in any way. If the server itself shows damage, you should fi le a damage claim with
the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the server. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where
heat, electrical noise and electromagnetic fi elds are generated. You will also need
it placed near a grounded power outlet. Read the Rack and Server Precautions in
the next section.
2-3
Preparing for Setup
The box the SuperServer 6017R-M7UF/6017R-M7RF was shipped in should include
two sets of rail assemblies, six rail mounting brackets and the mounting screws
you will need to install the system into the rack. Follow the steps in the order given
to complete the installation process in a minimal amount of time. Please read this
section in its entirety before you begin the installation procedure outlined in the
sections that follow.
Choosing a Setup Location
•
Leave enough clearance in front of the rack to enable you to open the front door
completely (~25 inches) and approximately 30 inches of clearance in the back
of the rack to allow for suffi cient airfl ow and ease in servicing.This product is for
Chapter 2
Server Installation
2-1
Chapter 2: Server Installation