3.
Screw in the terminal with a torque of 28 Nm.
4.
If the membrane has been used for passing the cables, check that it is correctly fitted in the unit. If a
packing gland has been used, ensure that it has the correct sealing, leaving a bit of slack in the cables so
they are not tight.
5.
Fit the polycarbonate guard.
6.
Close the lower compartment.

9.3.2. PRO Version

Assembly of aerial connectors
DANGER
It is essential to check the polarity of the strings and correctly assemble their aerial connectors to ensure that
the connection to the unit has the correct polarity. Ingeteam accepts no liability for any consequences resulting
from an incorrect connection.
Each string connected to the unit must be electrically independent of each other.
Connection via quick connectors
To ensure the correct operation of the switch, when connecting the strings the numbering must be respected.
That is, string 1 is connected to connectors PV1+ y PV1-. Proceed in the same way for the remaining strings to be
connected.
With the switch on Off and the unit completely closed:
1.
Remove the caps on the connectors to which strings are to be connected.
96
ABS2011IQM01_G - Installation and Operation Manual
DC connection

Advertisement