Figure 8-8. Ecb Removal And Installation; Table 8-9 Installing An Ecb - Compaq StorageWorks 2100 User Manual

Ultra scsi controller enclosures
Table of Contents

Advertisement

Figure 8–8. ECB removal and installation
1.
Using Figure 8–7, determine the specific bay to install the ECB.
NOTE: Make sure this bay supports the same cache module as the ECB being removed.
2.
Refer to array controller documentation for pluggable procedures and use these procedures to
replace the ECB.
Otherwise, proceed to step 3 for hot-pluggable procedures.
3.
Press the release tab and pivot the lever downward on the replacement ECB.
4.
Remove the blank panel from the vacant bay (A or B).
5.
Insert the ECB into the vacant bay until its lever engages the enclosure.
6.
Lift the lever upward until the lever locks.
7.
If enclosure power is applied, verify that the ECB charging LED
F
.
LASHING
8.
Following ECB initialization, verify that either the ECB charged LED
2
ECB charging LED
turned O
IMPORTANT: Do not remove the old ECB until the ECB charged LED on
the replacement ECB turns O
Removal and Installation Procedures
Table 8–9 Installing an ECB
.
N
.
N
CXO6922B
2
begins
1
or
CXO6358A
8–13
1
2
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks 2200

Table of Contents