6. Instructions for Continued Airworthiness, FAR 25.1529
A. General
(1) Maintenance requirements and instructions for continued airworthiness of the MCS
components are contained in the paragraphs that follow.
(2) Installation of the MCS on an aircraft by supplemental type certificate or Form 337
obligates the aircraft operator to include the maintenance information supplied by this
manual in the operator's Aircraft Maintenance Manual and the operator's Aircraft
Scheduled Maintenance Program.
(a) Maintenance information for the MCS (system description, removal, installation,
testing, etc.) is contained in this manual.
(b) LRU part numbers and other necessary part numbers contained in this manual
should be placed into the aircraft operator's appropriate aircraft illustrated parts
catalog (IPC).
(c) Wiring diagram information contained in this manual should be placed into the
aircraft operator's appropriate aircraft Wiring Diagram Manuals.
(d) The MCS system components are considered on--condition units and no
additional maintenance is required other than a check for security and operation
at normal inspection intervals.
(e) If a system component is inoperative, remove unit, secure cables and wiring,
collar applicable switches and circuit breakers, and placard them inoperative.
Revise equipment list and weight and balance as applicable prior to flight and
make a log book entry that unit was removed (refer to section 91.213 of the FAR
or the aircraft's minimum equipment list (MEL).
(f) The MCS components can be repaired at a factory authorized repair center or an
appropriately rated FAA Part 145 repair station.
(g) Once repaired, reinstall the LRU in the aircraft in accordance with the original
Form 337 approved data or instructions in this manual. Do a Return to Service
test of the system and approve it for return to service with a log book entry
required by section 43.9.
(h) Scheduled maintenance program tasks to be added to the aircraft operator's
appropriate aircraft maintenance program are as follows:
1
Recommended periodic scheduled servicing tasks: None required.
2
Recommended periodic inspections: None required.
NOTE: The (applicable LRUs) used with this system have test and
3
Recommended periodic scheduled preventative maintenance tests (Tests to
determine system condition and/or latent failures): None required.
 Honeywell International Inc. Do not copy without express permission of Honeywell.
MCS--4200/7200 Multi--Channel SATCOM System
inspections that are required by FAR 91.413 to be completed every
24 calender months.