Power On Testing; Safety Testing; Power-On Procedure; External Power Supply - Hisense Outdoor Series User Manual

Hide thumbs Also See for Outdoor Series:
Table of Contents

Advertisement

9 Power on testing

9.1 safety testing

Safety testing already done before shipping. If customers want to change wiring and other parts (like change
power cable, increase other electrical parts, etc.), please make safety testing before power-on to check any
short circuit. This operation shall be implemented under the guidance of professional electrical engineer with
multi-meter.

9.2 Power-on procedure

9.2.1 External power supply

Make sure voltage of power supply is compatible with the product before power on.

9.2.2 Switch off power

After switch off, the display is inactive state, the default state is switch on, please shut down and switch off
before maintenance
Switch

9.2.3 Display status test

The screen is in blue or playing content in normal condition and the internal fan start running.
Hisense B2B
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

65soa25pt

Table of Contents