9.3. Tape replacement
THE REPLACEMENT OF THE TAPE DOES NOT REQUIRE TO RE-CALIBRATE THE TEMPERATURE.
Follow the different sequences as described below. The Figure 13-1 : general assembly, list of the main
spare parts can also help.
9.3.1.
Disconnecting
sensor
Follow the instructions of section 10.4 "Sensing
probe replacement".
9.3.2.
Disconnecting
electronic box
− Unscrew with the 2.5 Allen key the 2 screws
(A) of the battery holder and pull it out as
shown on Figure 10-4.
− Unscrew with the 2.5 Allen key the 4 screws
(B) of the display unit and pull it gently out as
shown on Figure 10-4.
− Disconnect the connecting plug (C) as shown
on Figure 10-5 and remove the display unit.
− Unscrew with the 2.5 Allen key the tape holder
(G) by removing the 2 screws (F) and the
grounding cable (D) as shown on Figure 10-5.
Do not loose the 2 remaining screws that
secure the reel axle.
50489/GTEX Chem IIC/1805
the
tape
from
the
the
tape
from
the
(B)
(C) connecting plug
to display unit
41
Figure 10-4
(D) grounding cable of tape
(E) black oversleeve of tape
(F) securing screw
(G) tape holder
(H) tape
Figure 10-5
UTImeter Gtex Chem IIC
(A)
(I) securing screw