Battery Replacement - Honeywell HERMetic UTImeter Gtex Chem IIC Operation And Service Manual

Portable gas tight electronic gauging device
Table of Contents

Advertisement

9.2. Battery replacement

Warning : change the battery only in a non hazardous area.
− Unscrew the 2 screws of the battery holder using the 2,5 mm Hex Allen key which is located on the
carrying case. See .
− Pull it gently out.
− Change the battery (one-way only device). See Figure 10-4.
− Push the battery holder back in its housing (one-way only).
− Tighten the 2 screws. Nota: to prevent gripping risks, we recommend adding lubricating paste on screws.
Only following batteries are approved:
Disposing of general purpose & Alkaline batteries
Disposal should be in accordance with national and local regulations. Do not incinerate for disposal except in
a controlled incinerator
Due to concerns about mercury in the municipal solid waste stream, Duracell / Procell alkaline batteries used
are composed primarily of common metals—steel, zinc, and manganese—and do not pose a health or
environmental risk during normal use or disposal.
Caution: Do not throw batteries in rubbish; dispose them in a recycling bin.
50489/GTEX Chem IIC/1805
Duracell / Procell MN1604 (6LR61)
Duracell 9V Industrial (6LF22)
Energizer Max (6LR61)
. .
.
one-way only device
one-way only device
Figure 10-4
40
UTImeter Gtex Chem IIC

Advertisement

Table of Contents
loading

Table of Contents