4 Maintenance
Reconnect the electrical power supply connector.
Note:
For rack-mounted units, set the power switch to on, locate and secure the
instrument in the rack.
Apply the pneumatic pressure and/or vacuum supplies - switch on the electrical
power supply.
Switch on the instrument and carry out a serviceability test detailed in section 5.
PACE 6000
Cautions:
1.
AFTER REMOVING A CONTROL MODULE
2.
-
TWO
CHANNEL OPERATION
BE DONE WHEN BOTH PRESSURE MODULES ARE BELOW
DAMAGE OCCURS IF ONE PRESSURE MODULE IS BELOW
When installing two pressure modules, the module with the higher pressure
range must be located in the right-hand side (Module 1) above the power supply
connector.
If using two pressure modules of the
same pressure range, the module with
the lower serial number must be located
in the right-hand side (Module 1) above
the power supply connector.
Note:
When connecting the output ports of two pressure
modules together make sure both are either:
• below 70 bar.
OR
• between 100 to 210 bar.
To comply with the Pressure Equipment Directive (PED) do not mix these categories.
K0443 Issue No. 3
,
USE A BLANKING PLATE TO KEEP THE FLOW OF COOLING AIR
,
COMBINING THE OUTPUTS OF TWO PRESSURE CONTROL MODULES CAN
4 - 6
70
100
BAR OR BETWEEN
70
BAR AND THE OTHER IS
.
210
.
TO
BAR
100
210
.
TO
BAR
Serial number

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pace6000

Table of Contents