Operation; Preparation - GE PACE5000 User Manual

Pressure automated calibration equipment
Hide thumbs Also See for PACE5000:
Table of Contents

Advertisement

PACE Pressure Controller User Manual
3

Operation

3.1

Preparation

Make sure the electrical cables and pneumatic pipes comply with the installation
requirements in Section 2.
Carry out the following before use:
If necessary, carry out the maintenance task detailed in Section 4.
For bench-top, single instrument operation carry out the following:
Make sure the instrument power supply switch on the rear panel is set to OFF.
1.
Connect the instrument to the electrical supply, make sure the supply includes a
2.
connection to a protective earth.
Inspect the pneumatic hoses for damage, ingress of dirt and moisture.
3.
Before use, the instrument should be tested.
This section contains quick reference charts detailing all the available functions. The
functions shown and described may not be available on some models.
Review and become familiar with the whole procedure before starting a process on a
component or system.
Note: The touch-screen can be permanently damaged by sharp objects.
K0443 Issue No. 3
3 - 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pace6000

Table of Contents