GE PACE5000 User Manual page 37

Pressure automated calibration equipment
Hide thumbs Also See for PACE5000:
Table of Contents

Advertisement

PACE Pressure Controller User Manual
Divider
Select and set-up the divider task by pressing Divider from the task screen. The divider menu
defines high set-point, low set-point and then divides the span into a number of equal test points
(min 2, max 25).
Divider menu structure
Select required units, Rate, etc. in
the set-up menus. When Divider is
then entered from the Task menu,
these test point pressures and
number of test points can be set.
By entering control mode, enables
the Divider sequence of test
pressures (and controlled at the
selected rate).
Example:
High set-point = 2 bar
Low set-point = 0 bar
Number of points = 5
Test pressures =
0, 0.5, 1, 1.5 and 2 bar
1
3
4 4
2
P = pressureN = Number of pointsR = range between low set-point (1) and high set-point (5)
*
controlled pressure to each set-point
K0443 Issue No. 3
3 - 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pace6000

Table of Contents