7. MEMORY CARD AND BATTERY
7.1 Battery Specifications
7.2 Installation of Battery
8. EMC AND LOW-VOLTAGE DIRECTIVES
8.1 Requirements for conformance to EMC Directive
8.1.1 Standards applicable to the EMC Directive
8.1.2 Installation instructions for EMC Directive
8.1.3 Cables
8.1.4 Power supply module, Q00JCPU power supply section
8.1.5 Others
8.2 Requirement to Conform to the Low-Voltage Directive
8.2.1 Standard applied for MELSEC-Q series
8.2.2 MELSEC-Q series PLC selection
8.2.3 Power supply
8.2.4 Control box
8.2.5 Grounding
8.2.6 External wiring
9. LOADING AND INSTALLATION
9.1 General Safety Requirements
9.2 Calculating Heat Generation by PLC
9.3 Module Installation
9.3.1 Precaution on installation
9.3.2 Instructions for mounting the base unit
9.3.3 Installation and removal of module
9.4 Setting the Stage Number of the Extension Base Unit
9.5 Connection and Disconnection of Extension Cable
9.6 Wiring
9.6.1 The precautions on the wiring
9.6.2 Connecting to the power supply module
10. MAINTENANCE AND INSPECTION
10.1 Daily Inspection
10.2 Periodic Inspection
10.3 Battery Replacement
10.3.1 Battery service life
10.3.2 Battery replacement procedure
A - 13
A - 13