Handling - probst WEZ-06 Operating Instructions Manual

Grab for angular concrete products wez
Table of Contents

Advertisement

Available languages

Available languages

Operation and Adjustment
5.2.1

Handling

1.) Position the device in the "empty stroke
position" directly above the gripping good.
Make sure that the changing hook (1) is
hooked in.
3.) It is important to make sure that the device
is positioned in the middle of the gripping
good.
53100438
1
Fig. 9
Fig. 11
17 / 22
2.) Lower the device until it rests completely
on the gripping good.
4.) Move the lifting eye to the "load stroke
position" with the help of the carrier (e.g.
excavator).
Fig. 10
Fig. 12