When lifting, make sure that the changing
hook (1) can move freely.
Move the lifting eye to the "empty stroke
position" with the help of the carrier (e.g.
excavator).
53100438
1
Fig. 13
Fig. 15
18 / 22
Lift the device with the help of the carrier
(e.g. excavator) with the gripped L-stone (in
the area close to the ground). Then drive
slowly to the installation site and carefully
set down the L-stone.
When lifting the empty device (without L-
stone), the changing hook (1) must be
hooked in again (so that the rubber grippers
stay in opened (fixed) position).
Fig. 14
1
Fig. 16