Shimano ALFINE Inter-11 Dealer's Manual page 22

Table of Contents

Advertisement

INSTALLATION
Installation of the shifting cable
Cassette joint end
(x)
1
(A)
(B)
2
(z)
(y)
To be continued on next page
(A)
(B)
(C)
(D)
(y)
(z)
After checking that the end of the outer
casing is sitting securely in the cable
adjustment barrel of the shift lever,
attach the inner cable fixing bolt unit to
the inner cable.
Then, pull the inner cable while
attaching the inner cable fixing bolt unit.
(x)
10 mm
(y)
145 mm
(z)
63 mm or less
Bring the cable around to the cassette
joint pulley, hold it so that the inner
cable mounting nut is facing outwards
(towards the dropout), then slide the
flats part (z) of the inner fixing washer
into the notch (y) in the pulley.
22
(A)
Inner cable fixing bolt unit
(B)
Inner cable mounting nut
(C)
Inner cable fixing washer
(D)
Inner cable fixing bolt
Tightening torque
3.5 - 5.5 N·m
NOTICE
Do not use this inner cable fixing bolt unit
with the CJ-4S30 cassette joint.
TECH TIPS
When installing the inner cable fixing bolt
unit, use the setting tool TL-S700-B.
(A)
Inner cable mounting nut
(B)
Pulley

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alfine inter-8

Table of Contents