Shimano ALFINE Inter-11 Dealer's Manual page 28

Table of Contents

Advertisement

INSTALLATION
Installation of the shifting cable
(x)
3
(A)
4
(B)
(A)
5
(z)
To be continued on next page
After checking that the end of the outer
casing is sitting securely in the cable
adjustment barrel of the shift lever,
attach the inner cable fixing bolt unit to
(A)
the inner cable.
(B)
Then, pull the inner cable while
attaching the inner cable fixing bolt unit.
(C)
(D)
(y)
(z)
Turn the lever of the pulley clockwise.
In the following steps 5 and 7, continue
to work in this condition.
Bring the cable around to the cassette
joint pulley, hold it so that the inner
cable mounting nut is facing outwards
(towards the dropout), then slide the
flats part (z) of the inner fixing washer
into the notch (y) in the pulley.
(y)
(x)
10 mm
(y)
184 mm
(z)
75 mm or less
28
(A)
Inner cable fixing bolt unit
(B)
Inner cable mounting nut
(C)
Inner cable fixing washer (Black)
(D)
Inner cable fixing bolt (Black)
Tightening torque
3.5 - 5.5 N·m
NOTICE
This inner cable fixing bolt unit is designed
only for CJ-S700. 7-step and 8-step fixing bolt
units cannot be used.
TECH TIPS
When installing the inner cable fixing bolt
unit, use the setting tool TL-S700-B.
(A)
Pulley lever
(A)
Inner cable mounting nut
(B)
Pulley

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alfine inter-8

Table of Contents