Installation Of The Shifting Cable - Shimano ALFINE Inter-11 Dealer's Manual

Table of Contents

Advertisement

INSTALLATION

Installation of the shifting cable

2
3
(A)
4
(A)
5
(B)
To be continued on next page
Loosen and remove the inner hole cap.
(A)
Insert the inner cable into the winder
unit cable fixing groove, then pass it
through the hole in the cable adjustment
barrel.
(B)
Pull the inner cable so that the inner
cable drum fits into the hole in the
winder unit.
(B)
Screw in the inner hole cap as shown in
the illustration until it stops.
(A)
If it is turned any further, it will damage
the screw thread in the cover.
In addition, the unit cover may become
bent, which may cause an obstruction
between the unit cover and the main
lever, and the main lever may not
operate correctly.
If the main lever does not return
(C)
properly, loosen the inner hole cap
slightly to make a gap between the main
lever and the unit cover, and check that
this improves the returning of the main
lever.
20
(A)
Inner hole cap
(A)
Hole in cable adjustment barrel
(B)
Winder unit cable fixing groove
(A)
Inner cable drum
(B)
Hole in winder unit
(A)
Inner hole cap
(B)
Unit cover
(C)
Main lever

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alfine inter-8

Table of Contents