Mounting The Fixed Portion Of The Rail And The Locking Ears To The Rack - IBM 3534-F08 Installation And User Manual

Totalstorage san switch
Hide thumbs Also See for 3534-F08:
Table of Contents

Advertisement

Figure 9. Mounting the fixed portion of the rail and the locking ears to the rack
6. Install the outer (larger) slides in the rack, as shown in Figure 9.
7. Install the switch in the rack.
20
IBM TotalStorage SAN Switch: 3534 Model F08 Installation and User's Guide
12
11
5
4
a. Position a 3-hole bracket 4 at the end of one of the outer slides.
b. Attach the bracket using the 8-32 x 3/8 in. zinc screws 9 . Make sure that
the screw heads are inside the slides.
c. Place one of each of the following items on the outer end of the screw in the
order listed:
1) Washer flat No. 8 10
2) Washer, lock No. 8 11
3) Nut, hex, 8-32 12
d. Repeat steps 5a - 5b for the three remaining rail ends.
a. At the desired height, install the five M5 nut clips 5 ; put three in the front
of the rack and two in the back. The middle clip in the front of the rack is for
the locking ears.
b. Attach the slides using four M5 x 12 screws 7 .
c. Repeat steps 6a - 6b for the other rail.
a. Position the switch in front of the rack. Insert it into the rack by sliding the
inner slides on the switch into the outer slides on the rack. See Figure 10 on
page 21.
10
3
4
1
9
SJ000048

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents